Biomass boiler investment detailsJavascript is not currently enabled on your browser. Please enable it in the settings of your browser to use this interactive tool. This form assists in determining the economic feasibility of investing in a biomass boiler. This can be compared with either business as normal (leave Present Boiler Replacement Cost field empty) or investing in a replacement for the present boiler (enter a price in the Present Boiler Replacement Cost field). The default biomass boiler size is the same as the present boiler and the default capital cost is determined by the rule-of-thumb $150,000/MWth, these values should be updated to site-specific values if available. There are a large number of simplifying assumptions underlying this calculation so it should be used only as an indication and as a starting point for a more in-depth study. The economic feasibility is assessed in terms of:
The formula for these quantities is given by:
where
Last modified: Thu Dec 14 17:18:36 New Zealand Daylight Time 2006 |