Residue Recovery Costing Tool

Javascript is not currently enabled on your browser. Please enable it in the settings of your browser to use this interactive tool.

Use the following tool to help you determine the delivered cost of forest residue for a complete recovery operation. Please select either a one or two-stage transport option. A more flexible version, with more input options and more output detail, is available below

Residue Recovery Costing Tool

Purchase Cost: $/m3
Moisture Content: % (wet basis)
Transportation Logistics:

1 Stage Operation
Transport:
Distance: km

2 Stage Operation
1st Stage Distance: km
2nd Stage Transport:
2nd Stage Distance: km

Recovery:
Processing:
Storage:
Storage Time: months


Delivered Cost
By Volume ($/m3):
By Weight ($/tonne):
By Energy Content ($/GJ):

Back to Bioenergy Knowledge Centre Tools main page.

Advanced Residue Recovery Costing Tool

<
Purchase Cost: $/m3
Moisture Content: % (wet basis)
Transportation Logistics:

1 Stage Operation
Transport:
Distance: km
Rate (Customize ): $/m3km
Loading Cost (Customize ): $/m3

2 Stage Operation
1st Stage Distance: km
1st Stage Rate (Customize ): $/m3km
2nd Stage Transport:
2nd Stage Distance: km
2nd Stage Rate (Customize ): $/m3km
Loading Cost (Customize ): m3

Recovery:
Recovery Costs (Customize ): $/m3
Processing :
Processing Costs (Customize ): $/m3
Processing Losses (Customize ): % (By Volume)
Storage:
Storage Cost Rate (Customize ): $/m3month
Storage Loss Rate (Customize ): %/month (By Volume)
Storage Drying Rate (Customize ): %/month (By Volume)
Storage Time: months



Delivered Cost
By Volume ($/m3):
By Weight ($/tonne):
By Energy Content ($/GJ):
Breakdown of Costs (by Energy Content):
Percentage of final cost
Purchase Price %
Transport Costs%
Recovery Costs%
Processing Costs%
Storage Costs%

Delivered Moisture Content : % (wet basis)
Delivered Calorific Value : (GJ/tonne)

Back to Bioenergy Knowledge Centre Tools main page.

Last modified: Thu Dec 06 15:09:58 New Zealand Daylight Time 2007